Project Participations:


- Tekfen Al Khor Express Way Project Road Asbuilt Survey

- Samsung Idris Project GPR Services

- GHD Kankary Road Widening Topographic and Underground Utility Survey

- Al Balagh  3D Laser Scanning at ORYX GTL Facility

- Technip 3D Laser Scanning at ORYX GTL Facility

- Qatar Asphalt Ashgal Paving Areas

​- QRAIL Aktor Gold Line

- Sanborn GIS Setting Out

- Sinohydro Construction Survey Support at SIDRA Village Project

- Lusail Sports Hall and Lusail Marina Arch Projects

- GCC Road As-buit and Topographic Survey at Al Knor for Ashgal

- Barwat Al Barha Earth Work Volume Calculation

- OPQL AMEC BlackCat Offshore Platform 3D Laser Scanning

- EDC/VCM Plant Upgrade 3D Laser Scanning

- QChem Waste Treatment Facilities Upgrade 3D Laser Scanning

- ORYX GTL 3D Laser Scanning

- RASGAS Replacement of Scrub Column (45-C001) 3D Laser Scanning

- Engineering Consultancy Services for Water Supply to UMM BAB, JALEHA, Aand KHATIYAH NORTH Topographic Survey

- Tower C and Tower F of Porto Arabia in Pearl Qatar Asbuilt Survey

- Upgrading of Drainage at Mesaieed Refinery Topographic and Underground Utilities Services Survey

- Project Grid Lines of Muftah Villa at Wakrah Setting out and Demarcation Survey

​- Shahaniyah Farm Underground Utilities Services Survey

- Qatar Olympic Horse Track Topographic Survey

- Qatar Coastguard Observation Station Bathymetric Survey

- Banana Island Bathymetric Survey

- QP District Steel Brackets Setting out and Asbuilt Survey

- Coarse Filter S-5170 By Pass Area 3D Laser Scanning 

- Umm Quraiba Farm Utilities Survey

- Automation Upgrade in Dukhan Cross Country Fiber Optic Cable Topographic Survey

Jetty Area at QCon Yard Bathymetric Survey

- Doha Golf Course Topographic Survey

- Doha International Airport Topographic Survey and Underground Services Detection

- Madina RLIC Dimensional Control

​- RASGAS Onshore Expansion Dimensional Control

- NEW DOHA INTERNATIONAL AIRPORT Cargo Terminal Consignment System Rack For Consignment Store Asbuilt Survey

- Columns, Floors,Beams, Slab Edges and Corewalls of VB 22 and VB 23 at The Pearl Asbuilt Survey

- Boundary and Exacavation Limit of FF-10 at The Pearl Demarcation Survey

- Replacement of Shell Plates for Tank 2101FE at QP Refinery, Mesaieed 3D Laser Scanning

- GCC Sealine Road SurveyEl Shargi Field Development, De-bottle necking on WHJ ISW07 Dimensional Control 

- Hyatt Plaza Asbuilt Survey

- 60 Stations in Dukhan Fields Topographic Survey

- 4th GTG project OXY Dimensional Survey

- Qantex Labor Camp Topographic Survey

- MMUP CADASTRAL Surveys

   and many more (contact us for an updated Company Portfolio)